Cannabis Derivative Product Manufacturing Facility

Location

Prince Edward Island, Canada

Role

Engineering Consulting

Client

Auxly Cannabis Group // Dosecann Cannabis Solutions

Brief Summary

Clean Conduit had a lead role in the development of Dosecann’s $35M facility from the early stages to a production-ready facility.

Background

In the competitive and relatively new field of cannabis production, timing is key. Our client, who holds a Dealer’s Licence for Controlled Drugs and Substances from Health Canada, needed support with the build-out of a flagship $35M+ facility in preparation for the expected product demand once legalization 2.0 launched (Oct. 17, 2019, legalization with product release in December).

The facility was designed to accommodate end-to-end delivery of products within two main segments: Medical products and Consumer Packaged Goods.

Our primary role was to coordinate the efforts of scientists, manufacturers, vendors, contractors and service providers towards the successful development of the facility and launch of innovative products on a very tight timeline. This included chocolates, vapes, chewables, capsules, distillate, raw material inputs, pre-rolls, etc.

Services Provided

  • Procurement of automated packaging and quality equipment
  • Detailed engineering design review
  • Collaboration with contractors and designers
  • Process equipment selection
  • Production flow
  • Product development planning
  • Coordination of Pre-start Health and Safety Review

Major Contributors

  • Fitzgerald & Snow
  • Lonza Capsugel
  • Capmatic
  • MCA Consultants Inc
  • Richardson Associates Ltd.
  • RJ Bartlett Engineering Ltd.
  • Jensen Hughes Consulting Canada Ltd.

Project Impact

  • Dosecann 2.0 products represented a significant share of the early market release having been one of only a few cannabis firms that launched products immediately upon legalization in Dec, 2019.
  • Procured, installed and commissioned the first and only operating capsugel line in Canada with design capacity of over 800,000,000 capsules/annum.
  • Established storage for raw materials, quarantine, WIP, and finished goods under one roof.
  • Deployed temporary engineering and resources during construction to allow product manufacturing in time for the 2.0 launch.
  • Achieved optimum operational flexibility to accommodate a variety of future processes.

Learn more about how CCI approaches engineering challenges and discover how we can help your company succeed.